Since 2010, Blum & Sons Electric has been a top service provider for electrical contracting projects at Vandenberg Air Force Base. Projects have dealt with the one of the Highest Security Operations Facility at VAFB for Mission Critical Operations, multiple critical facility shutdowns involving NRO operations world wide, and high level of safety conditions.
This project met NRO construction schedule even when given multiple design changes during the building construction.
Blum & Sons Electric became part of the engineering design team, providing expertise for construction management. In doing so, we were able assist the electrical engineering design team in minimizing construction costs and ultimately providing an infrastructure power system with multiple redundancies.
Our work here earned a Certificate of Appreciation from U.S. Army Corps of Engineers.
Highlights
- New 1600 Amp main switchgear
- New lower tier distribution
- Upgrade and repair of mission critical equipment
- Working as sub constractor on BVB Construction
- Earned Certificate of Appreciation from U.S. Army Corps of Engineers
Company News
Chumash Casino in Santa Ynez
Blum and Sons Electric, Inc., has performed extensive work at the Chumash Casino from providing support when relocating gaming equipment in the casino, updated generator infrastructure, hotel room renovations and installing EV charging stations.
PROJECT UPDATEs
Chumash Casino in Santa Ynez
Blum and Sons Electric, Inc., has performed extensive work at the Chumash Casino from providing support when relocating gaming equipment in the casino, updated generator infrastructure, hotel room renovations and installing EV charging stations.