On-Site Electricians
Lost Time Incidents
Construction Site (Acres)
Project Duration (Months)
Project description
Project consisted of 18 separate residential apartment buildings with a total of 266 individual apartments. Additional work included a recreation / administration building and community pool. Installation consisted of site utility work, switchgear / multi metering, site lighting, power distribution (site and interior), fire alarm, data communications infrastructure, and interior cabling. A retail plaza was part of the project which included shell work and site lighting. An additional contract was awarded for tenant improvement with R&R furniture.
Highlights
- pool and site facilities
- 18 buildings
- 266 apartments
- tenant improvements (R&R Furniture)
Company News
Chumash Casino in Santa Ynez
Blum and Sons Electric, Inc., has performed extensive work at the Chumash Casino from providing support when relocating gaming equipment in the casino, updated generator infrastructure, hotel room renovations and installing EV charging stations.
PROJECT UPDATEs
Chumash Casino in Santa Ynez
Blum and Sons Electric, Inc., has performed extensive work at the Chumash Casino from providing support when relocating gaming equipment in the casino, updated generator infrastructure, hotel room renovations and installing EV charging stations.